MPS has a program to evaluate and maintain the integrity of the power system from top to bottom, a head to toe approach. The program areas include the following:

Delivery Point Substations (where power is received from TVA)

  1. Maintenace & Testing of Transformers, Breakers and Battery Systems
  2. TVA Loss Control and Verification
  3. Oil Testing of major transformers

69kV Transmission System

  1. Pole and line inspection every 5 years
  2. Vegetation Management to assure Right of Ways are cleared every 3 years

Distribution Substations

  1. Maintenance of Transformers and Load Tap Changers
  2. Oil testing of Transformers
  3. Maintenance & testing of breakers and bettery systems
  4. Testing of TVA revenue meters
  5. Semi-annual infrared testing of switches, arrestors & transformers

Primary Distribution (13.8kV) System

  1. Recloser and capacitor inspection every 3 hours
  2. Pole base survey & treatment (10 year cycle)
  3. Overhead primary line inspections (10 year cycle)
  4. Operations testing of 3-phase disconnect switches (5 year cycle)
  5. Semi-annual infared testing of switches, capacitors, arrester, underground transitions and transformers
  6. Vegetation Management to assure Right of Ways are cleared every 3 years

Customer Meters

  1. Residential meters - test every 10 years
  2. Demand meters - test every 5 years
  3. Primary meter installations (larger customers) - test every 3 years